COILED TUBING PERFORMANCE FOR HORIZONTAL AND DEVIATED WELLS IN SELECTED NIGER DELTA RESERVOIRS

ABSTRACT

 Generally Coiled Tubing operation has been on steady increase for post drilling completion operations such as well clean-up, balance/under balance washing, stimulation, production logging and testing especially in horizontal wells. In order to establish the feasibility of CT- assisted operations, a comprehensive engineering analysis which predicts the CT mechanical performance and its penetration limit is carried out. The predictive mathematical technique procedure was applied to a typical two-dimensional horizontal well (i.e. with a Constant azimuth) along three major paths: (i) Identification of the well and Coiled Tubing mechanical data. (ii) Estimation of the CT hydraulic limit. (iii) Prediction of the limit of penetration (LOP) of CT in the horizontal well completion with a sensitive analysis of the LOP based on variable pipe frictional coefficients.

Related Posts

THE PREVALENCE OF Aspergillusniger ON THE HANDS OF PRIVATE SCHOOL PUPILS IN OZORO

ABSTRACT Microorganisms live as transient contaminants in fomites or hands where they constitute a majorRead More

DETERMINATION OF TRACE ELEMENTS FROM VARIOUS WATER SOURCES IN KADUNA METROPOLIS, NIGERIA

ABSTRACT The study assessed the concentrations of trace elements from various water samples collected fromRead More

EIA AND THE PHYSICAL ENVIRONMENT: THE PROMISES AND CHALLENGES IN NATIONAL DEVELOPMENT

ABSTRACT Developmental activities are spatially and temporally specific in nature, and  are characterized by impactRead More

Leave a Reply

Your email address will not be published. Required fields are marked *